The Challenge Hollander Hospitality wanted a new sign made for their renovated hotel in the heart of Everett. The sign’s design required large tube steel, which required in-the-field welding of the superstructure to mitigate welding on the roof. Aalbu...
Firetruck Trailing Arm & Frame Repair ; The Challenge The local fire department maintenance director reached out to us to inspect a firetruck that showed signs of trailing arm damage. Upon inspection, found that the trailing arm was misaligned due to several...
Custom Roll Cage & Rock Sliders ; The Challenge Our customer, a long term friend, asked us to build him a replacement roll cage and rock sliders on his 1976 Jeep CJ-5. We worked on it in the time between other projects as the customer wasn’t on a time...
Trailer Pintle Hitch Extension ; The Challenge The customer requested to have a 20,000lb hitch attached to their truck to tow 2 trailers that didn’t ride well because their pintle hitch on the truck was too high causing their trailer to ride slanted down the...
Everett Paratransit Frame Repair Case Study The Challenge The City of Everett Motor Pool Division contacted us on a Friday to have us take a look at their cracked frames on 8 of their Paratransit buses. The cracks were found after an accident showed a crack on a bus...